Design. Engineer. Build.
Closer Integration. Greater Transparency. Superior Results.
Is Design-Build right for you?
Take Our QuizWhat makes us different?
At Oliver, world-class architects and expert builders work together to create a seamless flow of both big creative ideas and small technical details to give our clients — from those with billions in revenue to those just getting started — clarity and control at every step in our shared journey from concept to keys.
Learn MoreTestimonials
-
We work with Oliver on our projects mainly because of our past experience with them and knowledge of our buildings. Also because they have impeccable service. We’ve never been disappointed with any project we’ve worked on with them.
Gordon Michaelson
Vice President of Advanced Manufacturing
Generac Power Systems
-
The design build process is a great process because it’s streamlined. You know what you’re getting with these guys: You are getting a quality, superior product, you’re getting great people who care about their community. That’s something we want to be aligned with.
Jon Lange
Chief Executive Officer
Glacial Community YMCA
-
One of the things that has been most valuable about working with Oliver is their proactive approach when things are in danger of not being on time or on budget and quickly pivoting to any alternative options. The ongoing transparency and communication has been invaluable.
Vicki Liakos
Implementation Project Manager
Trek Bicycle
-
We are extremely happy with Oliver Construction and the contractors they chose for us to work with. The work these guys did and the materials we all chose turned out amazing.
Rick & Jessica Wantland
Owners
Salon 53
-
We manage a child development center for Standard Process in Palmyra. Recently we worked with Oliver Construction Company ….It could not have been a better experience.
Patricia O'Connor
Client Outreach Manager
Bright Horizons
Projects
-
Trek Bicycle Corporation
We have worked for Trek on projects ranging from 2,000-200,000 sf over the last 20 years.
-
Metalcraft of Mayville
Oliver Construction was awarded the 44,000 sf addition on two levels on a steep, challenging site for Metalcraft of Mayville, WI.
-
Ixonia Elementary
Oliver has completed work at Ixonia Elementary that includes an addition that will house new classrooms, a cafeteria and school offices.
-
Waukesha State Bank – Headquarter’s
Oliver’s goal was to demolish, renovate, and build 80,000 S.F. of new lobby, customer services, and administrative offices.
-
Generac Power Systems Sound Test Pad
Oliver Construction designed and is constructing a new sound testing facility for Generac to test the sound levels of products of all sizes.
-
Trek Lodge
Oliver Construction Co. & Trek have successfully completed the 5,950SF LEED v4 Lodge project located on the trails of Trek’s Waterloo Campus.
-
F&M Bank – Juneau
There’s a lot of architectural detail packed into this small bank, making it approachable and a stand-out building in the town of Juneau.
-
New Berlin Grading
Oliver designed and built this 14,356 square foot building which will serve as the new Headquarters for New Berlin Grading.
-
F&M State Bank
F&M Bank project includes an impressive natural stone façade and exterior architectural detailing based on the ‘Rustic Cabin’ motif.
-
Bergmann & Hohm Dental
Oliver Construction Co designed and constructed a beautiful, free-standing dental clinic (11,000sf).
-
Vince Lombardi Cancer Clinic
Oliver Construction Co. was selected by Aurora Health Care for a new cancer treatment center with a fast track completion schedule.
-
Denali Ingredients
The $5.5 million buildout includes a complete re-facing of the exterior façade intended to support Denali as a top ingredients supplier.
-
Generac Power Systems Expansion
This Generac Power systems project, completed in 2023 included a Generator Testing Facility with multiple stations.
-
Nicholson Manufacturing
The new 100’ wide by 300’ long by 40’ tall Manufacturing Facility features two full length crane bays with multiple cranes
-
D&H Industries
This addition houses heavy stamping operation on heavy-duty racking, several presses, a robotic welding station, and laser cutting equipment.
-
Okauchee Fire Department
This remodeled fire station included a 5,000 S.F. addition with a storage mezzanine to the existing fire station.
-
Watertown Fire Department
This project includes the build out of the Watertown Fire Department.
-
Fitchburg Municipal Building
We designed and built 10,000 sf of office space and 30,000 sf of maintenance storage in the greater Madison area.
-
Milwaukee Community Sailing Center
Oliver built this award-winning sailing facility with its unique architectural style on Lake Michigan.
-
Chenequa Country Club
Oliver has designed several projects here including on-course restrooms, locker rooms and the clubhouse renovations from 300-13,000sf.
-
YMCA at Pabst Farms
This project includes a 110,000 sqft YMCA with a pool, basketball, baseball, locker rooms.
-
Summit Center Market Place
Each of the five buildings in this new development is uniquely different on the inside while the exterior facades blend together.
-
Pewaukee Retail Center
Oliver constructed what appears to be ten individual buildings all at one time totaling 80,000 sf.
-
Olin-Sang-Ruby Union Institute
Oliver Construction has completed many projects over the years for the Olin-Sang-Ruby-Union Institute.
-
Elmbrook Church
Oliver Construction Co. has had the privilege of being a part of Elmbrook Church’s growth
-
Our Savior’s Lutheran Church
Oliver designed and built the original church and two additions totaling 44,000sf.
-
Meadow View Elementary
The newly completed school includes improved common spaces, gym & main entrance.
-
OASD East Campus
As the Oconomowoc area continued to grow, the Main Campus of Oconomowoc High School no longer met the needs of the large student body.
-
Generac Power Systems Headquarters
We worked with Generac Power Systems HQ in Waukesha to complete the “Phase 4” expansion and remodeling efforts.
-
Metalcraft of Mayville – West Bend Addition
This Metalcraft of Mayville expansion consisted of a 36,000 sq ft addition to the existing manufacturing plant in West Bend, Wisconsin.
-
Standard Process
Standard Process build out in Palmyra, WI features 60,000 sq ft of a new distribution center including storage racking and office spaces.
-
UniFirst
UniFirst build out in Madison, WI features 12,500 sq ft of a warehouse, offices, and a pre-engineered metal building.
About Oliver Construction
We are a leading Design-Build firm that unites the power of transparency inherent to the Design-Build model with the power of being transparent with our clients. The result is an end-to-end, one-stop architecture and construction partner that ensures a seamless flow of information within and between our team, our subs, and our clients to complete projects on time, on budget, and on vision.
Learn MoreContact us today about your next project.
Discover why many of our largest clients have depended on our expertise multiple times in multiple states across multiple decades. For them we’re not just a one stop shop. We’re their last stop as well.