Generac Power Systems Beaver Dam
Client Name
Generac Power Systems
Location
Beaver Dam, WI
Size
345,000 sq ft
Groundbreaking
April 2024
Construction Completed
April 2025
Overview
- 324,000 SF Manufacturing Facility
- 15,000 SF Office Space
- 1,100 SF Training Room
- 4 Assembly Lines
- 4 Test Cells, each with 3–5 test stations depending on the unit produced
- Design-Build Delivery
