Generac Power Systems Beaver Dam

Client Name

Generac Power Systems

Location

Beaver Dam, WI

Size

345,000 sq ft

Groundbreaking

April 2024

Construction Completed

April 2025

Overview

  • 324,000 SF Manufacturing Facility
  • 15,000 SF Office Space
  • 1,100 SF Training Room
  • 4 Assembly Lines
  • 4 Test Cells, each with 3–5 test stations depending on the unit produced
  • Design-Build Delivery

Contact us today about your next project.

Discover why many of our largest clients have depended on our expertise multiple times in multiple states across multiple decades. For them we’re not just a one stop shop. We’re their last stop as well.