Generac Power Systems Expansion
![](https://oliverconstruction.com/wp-content/uploads/2023/03/0932.jpg)
Client Name
Generac Power Systems
Location
Waukesha, WI
Size
18,000 sqft
Ground Breaking
September 2022
Construction Completed
December 2023
Overview
Generator Testing Facility with multiple stations indoor and outdoor.
- Structural Steel Building with Insulated Metal Panel exterior
- Masonry Enclosed Test Cells
- Exterior Steel Structure for Outdoor Testing Facility
- 3000 Cubic yards of concrete
- 112,000 pounds of rebar
- 34,000 individual units of masonry block
- 290 tons of structural steel
- 28 tons of roof joists