Standard Process

Client Name
Standard Process
Location
Palmyra, WI
Size
60,000 sq ft
Construction Completed
July 2023
Overview
- Demolition of an existing building on site
- New building is 60,000 square feet
- Precast Exterior Wall Panels – 42’ tall high building
- Current plans call for ~25,000 square feet of storage racking space
- 4000 square feet of office space inside
- Usage will be the new Distribution Center having relocated their finished goods out of their current plant located across the street
- Ground Breaking July 2023
- Owner Occupancy March 2024 with operation by Summer 2024
- Our Fire Protection, Plumbing, HVAC, and Electrical was all done design/build in partnership with Oliver Construction being the Design/Builder. Excel Engineering is responsible for the Civil Engineering.