Generac Power Systems Headquarters

Client Name

Generac Power Systems

Location

Waukesha, WI

Size

62,600 sq. ft.

Construction Completed

2022

Overview

We worked with Generac Power Systems HQ in Waukesha to complete the “Phase 4” expansion and remodeling efforts. These efforts provided a spacious, airy environment with easy access for employees. For entry, we added an employee entry with elevator and stair access. To convey an open concept upon entry, we converted the existing 2-story factory space into an atrium with natural light, added a circulation spine supporting future phases, and included a multi-level employee patio.

We also converted the existing factory space into an open office with support spaces and added substantial natural light openings with a metal panel exterior wall system. In addition, we converted part of the factory space into a training center with a 300-person auditorium, large training rooms, and webcast rooms. And lastly, we converted the remaining factory space into a fitness center with locker rooms, the capability for weight training, and group classes.

Contact us today about your next project.

Discover why many of our largest clients have depended on our expertise multiple times in multiple states across multiple decades. For them we’re not just a one stop shop. We’re their last stop as well.