Generac Power Systems Sound Test Pad
Client Name
Generac Power Systems
Location
Waukesha, WI
Ground Breaking
June 2022
Construction Completed
January 2023
Overview
Oliver Construction designed and constructed a new sound testing facility for Generac to test the sound levels of current and future products of all sizes. The structure was additionally designed to accommodate future requirements as testing standards become more stringent.
- Exterior Generator Sound Testing Facility
- 50-ton Overhead Bridge crane
- Semi-drive through capability