Generac Power Systems Sound Test Pad

Client Name

Generac Power Systems

Location

Waukesha, WI

Ground Breaking

June 2022

Construction Completed

January 2023

Overview

Oliver Construction designed and constructed a new sound testing facility for Generac to test the sound levels of current and future products of all sizes. The structure was additionally designed to accommodate future requirements as testing standards become more stringent.

  • Exterior Generator Sound Testing Facility
  • 50-ton Overhead Bridge crane
  • Semi-drive through capability