Generac Power Systems Expansion

Client Name

Generac Power Systems

Location

Waukesha, WI

Size

18,000 sqft

Ground Breaking

September 2022

Construction Completed

December 2023

Overview

Generator Testing Facility with multiple stations indoor and outdoor.

  • Structural Steel Building with Insulated Metal Panel exterior
  • Masonry Enclosed Test Cells
  • Exterior Steel Structure for Outdoor Testing Facility
  • 3000 Cubic yards of concrete
  • 112,000 pounds of rebar
  • 34,000 individual units of masonry block
  • 290 tons of structural steel
  • 28 tons of roof joists