Generac Power Systems Expansion

Client Name
Generac Power Systems
Location
Waukesha, WI
Size
18,000 sqft
Groundbreaking
September 2022
Construction Completed
December 2023
Overview
Generator Testing Facility with multiple stations indoor and outdoor.
- Structural Steel Building with Insulated Metal Panel exterior
- Masonry Enclosed Test Cells
- Exterior Steel Structure for Outdoor Testing Facility
- 3000 Cubic yards of concrete
- 112,000 pounds of rebar
- 34,000 individual units of masonry block
- 290 tons of structural steel
- 28 tons of roof joists